Capabilities

Activewear Quality Control

Quality is not a final inspection. It is a set of decisions made at fabric approval, cutting and inline — by the time the cartons are sealed, you can only reject, not fix.

At a glance
Checkpoints
Fabric approval, inline, mid-line, final
Standard
AQL 2.5 major / 4.0 minor (tighter on request)
Measured
Critical dimensions per style, flat after relaxation
Records
Inspection report per lot

Three checkpoints, not one

Inline inspection happens during sewing, before the garment is closed. It catches seam puckering, skipped stitches and wrong trim before they are buried inside a finished piece. Mid-line checks measurement drift. Final inspection samples the packed lot against the approved sample.

A factory that only inspects at the end is checking whether it is too late to fix anything.

What we measure on a legging

Waistband relaxed and stretched, rise, inseam, thigh, knee and leg opening — measured flat after the garment has relaxed, because a legging measured straight off the machine reads short. Seam strength at the crotch gusset, elastic recovery after repeated stretch, and opacity under tension.

For bras: underband tension, strap attachment, cup symmetry and hook-and-eye or bonding integrity. For tops: neckline recovery and armhole symmetry.

AQL and what the numbers mean

Most apparel programs inspect to AQL 2.5 for major defects and 4.0 for minor. That is a statistical sample, not a promise of zero defects — it defines how many you should expect to find in a lot and whether the lot passes.

If your channel cannot tolerate returns, ask for a tighter AQL or a higher inspection level. Both cost money and both are agreed before production, not after.

The defects that actually cause returns

Sheer leggings under stretch, waistbands that roll or dig, seam grin at the crotch, colour bleeding in the first wash, and size-to-size inconsistency. Almost all of them are decided at fabric selection and grading, which is why we push both before bulk.

Every lot ships with the inspection record so you can see what was checked and what was found.

Need this answered for your specific product?

Send the product type, the destination market and your target price. You get a straight answer on what is workable and what is not, before you pay for anything.

Start an enquiry

Frequently asked

QCan I use a third-party inspection company? +
Yes. We schedule the slot and make the lot available; the cost is yours.
QWhat AQL do you inspect to? +
AQL 2.5 major and 4.0 minor by default. We can tighten it if your returns tolerance requires.
QWhat happens if a lot fails? +
We rework or re-cut before shipping. You are told before the cartons leave, not after.
QDo you test fabric before cutting? +
Yes — recovery, opacity and shrinkage on the bulk fabric, not just the sample fabric.